Google Translate

Google Translate . . . . French German Spain Italian Dutch Portuguese Japanese Arabic Chinese Simplified

Friday, February 3, 2017

Refurbishment of Lac Vert, Catus

The refurbishment of the Lake (Lac Vert) on the outskirts of Catus started about a year ago and is expected to be completed by the end of February. The work involved

  • draining the lake completely, 
  • building a dyke alongside the internal roadway, 
  • creating a sluice to control the flow of water into the canal and lake,
  • building a new beach area and
  • reinforcing the main dam. 

The drained lake bed
View across the drained lake bed before the building of a
dyke on the right
The canal with the completed dyke to the left
Sluice gate across the canal to control water flow into the lake