The refurbishment of the Lake (Lac Vert) on the outskirts of Catus started about a year ago and is expected to be completed by the end of February. The work involved
- draining the lake completely,
- building a dyke alongside the internal roadway,
- creating a sluice to control the flow of water into the canal and lake,
- building a new beach area and
- reinforcing the main dam.
|
The drained lake bed |
|
View across the drained lake bed before the building of a
dyke on the right |
|
The canal with the completed dyke to the left |
|
Sluice gate across the canal to control water flow into the lake |
No comments:
Post a Comment